The gear and rack drive devices are used to realize various movements of the stage in modern stage. Aiming at the problems of vibration and noise in the operation of rigid driving device, which affect the stability of stage motion and working environment, a sprocket chain plate driving structure is designed. The model of the driving device is established, and the driving system is simulated and dynamically analyzed, and the field test is carried out. The results show that the sprocket chain plate drive device has flexible effect, eliminates the defects of the rigid drive device, makes the stage transmission stable and reduces the noise. The driving device is applied in practical engineering, which proves the rationality of the design.
关键词
舞台驱动装置齿轮齿条链轮链板优化设计舞台升降台
Keywords
Stage driving deviceGear and rackSprocket chain plateOptimal designStage elevator
JIANG Yan.Research on cultural and technological integration,development and industrial promotion of cultural performing arts-a case study of Suzhou cultural performing arts[J].Big Stage,2015(10):116-117.
张晓明.中国文化产业发展之历程、现状与前瞻[J].山东社会科学,2017(10):44-49.
ZHANG Xiaoming.The development course,current situation and prospect of China's cultural industry [J].Shandong Social Science,2017(10):44-49.
LI Wei,GONG Maoli,MAO Haijie,et al.Synchronization control method of multiple motors in lifting stage system[J].Journal of Lanzhou University of Technology,2014,40(2):81-85.
WEI Fakong,TIAN Haihong,WANG Dong,et al.Discussion on technical points of stage surface machinery and equipment in theater[J].Journal of Lanzhou University of Technology,2004,30(2):51-54.
ZHANG Bin,YANG Hui.Stability analysis of lead screw for a special lift platform based on finite element method[J].Aviation Precision Manufacturing Technology,2018,54(1):11-15.
SHAO Haiyan,HAN Zhuqing.Comparative analysis on transmission modes of elevating and horizontal shifting parking equipment[J].Jiangsu Science and Technology Information,2016(16):70-71.
YUAN Junjie,FAN Hengman,JIANG Dongxue,et al.Hoisting method of steel wire rope of hoisting and horizontal shifting parking equipment[J].Hoisting and Transportation Machinery,2017(10):67-69.
LI Wei,GE Zhenfu,GONG Jianxing.Soft and hard fusion synchronization coordination method for 2D stage weiya system based on ADRC[J].Journal of Lanzhou University of Technology,2017,43(3):80-86.
LI Wei,LI Qingpeng,MAO Haijie,et al.Synchronization control method of stage speed regulation boom group based on coupling composite of internal die and deviation[J].Journal of Lanzhou University of Technology,2014,40(4):76-80.
XU Changhang,LÜ Tao,CHEN Guoming,et al.Dynamicanalysis of the gear rack lifting mechanism for jack-upplatform[J].Journal of Mechanical Engineering,2014,50(19):66-72.
CAO Yuguang,ZHANG Qing,ZHANG Shihua.Finite element analysis of the strength of jack-up platform pinion and rack[J].Journal of China University of Petroleum(Natural Science Edition),2010,34(6):120-124.
CHENG WL.Analysis of dynamic response rack-and-gear lifting device for offshore drilling platform[J].Machinery,2017(3):1-5.